CEP Project

PT Tunas Jaya Perkasa has secured a mining contract with PT Cristian Eka Pratama, a subsidiary of PT Petrindo Jaya Kreasi, commencing in early 2024. The scope of work includes overburden (OB) removal, coal mining, coal hauling, and road maintenance. The initial contract duration is 5 years, with the possibility of extensions based on performance and the estimated 15-year lifespan of the mine.

Project Overview

CEP – Commenced in early 2024, the scope of work includes overburden (OB) removal, coal mining, coal hauling, and road maintenance. CEP’s challenging ground conditions demand specialised expertise and equipment capability.

The site presents rough and highly variable terrain, including wet, muddy, soft, and abrasive surfaces. To ensure operational efficiency and safety under these demanding conditions, we deploy articulated dump trucks specifically suited for low-traction and unstable ground environments.

Through disciplined site management, experienced operators, and purpose-selected equipment, we maintain consistent production performance while prioritising safety, equipment longevity, and environmental compliance.

Gallery Documentation

LOOKING FOR A RELIABLE MINING PARTNER?

Contact us today to discuss your mining, heavy equipment rental, or transportation needs across Indonesia.

Scroll to Top